Lot 1: Design and Construction of wastewater treatment plant in the Municipality of Bitola”
NEAR/SKP/2024/EA-RP/0030
NEAR/SKP/2024/EA-RP/0030
Main Objectives
To improve municipal wastewater collection and treatment infrastructure in compliance with the directive 91/271/EEC and National Law.
The project envisages measures for design and construction of WWTP in Municipality of Bitola, which would contribute to the following:
- To improve sanitary and hygienic conditions and standards for the population;
- To improve substantially the presently unacceptable environmental conditions of the recipient (Dragor River) (dilution less than 1:1) and the river water quality after the outfall of the WWTP that will meet the targets of environmental standards;
- To decrease further downstream nutrient accumulation and eutrophication in the transboundary stream of Vardar River and the Aegean Sea;
- To ensure proper functioning of the future Central WWTP.
Specific objective (outcome)
Design and construction of wastewater treatment plant for 112,474 PE with total daily average flow of approximately 27,090 m3/day.
Works will be implemented following FIDIC Conditions of Contract (“Yellow Book”, 1999 edition) and Contract documents
Project Outputs/Activities
Wastewater treatment plant for 112 474 PE with total daily average flow of approximately 27090 m3/day in Municipality of Bitola
Project type
Construction contract
Project budget
21.707.370 eur
Start date
End date
Project status
Current
Beneficiary
Ministry of Environment and Physical Planning (MoEPP)
End Beneficiary
Municipality of Bitola
Public Utility Company (PUC) “Niskogradba” Bitola
Contractor's name
Lantania S.A.U (ES)
Stenton Gradba D.O.O. (MK)
Karkanias Environmental Technology S.A (GR)
JV
Responsible Implementing Department within MoEPP
Department of Waters